Discussion of: Ground Improvement Using Preloading with Prefabricated Vertical Drains
Abstract
Keywords
Ground improvement; immediate compression; consolidation settlement; secondary compression; wick drains; drain spacing; smear zone; preloading future maintenance
Citation
Fellenius, B. H. (2014). Discussion of: Ground Improvement Using Preloading with Prefabricated Vertical Drains, Vol. 3, Issue 2, p.67-72. doi: 10.4417/IJGCH-03-02-01
DOI: http://dx.doi.org/10.4417/IJGCH-03-02-01
Copyright © 2004-2018 Elxis s.a. All rights reserved. Powered by Argo-E LLC.